Softtech Success Story - Bilig Opex
English Ptesi - Cuma 09:00-18:00 +90 2167092987

Softtech Success Story

Softtech - Problem Definition

In 2023, the average internal block time was measured as 42 days. It was observed that in 50% (median) of blocked items, the block time was less than 22 days. Therefore, a Lean Six Sigma Yellow Belt project was initiated to reduce the block time from 42 days to approach the median of 22(+4) days.

Analysis of the Current Situation

Initially, addressing internal job blockages was prioritized due to quicker resolution times. Data selection focused on a specific department as a sample. Subsequently, a thorough analysis of blocked jobs within teams was conducted, filtering out long-standing blockages.

Gains After the Studies

With the reduction in block time, an improvement in Time To Market (TTM) is aimed, leading to increased customer satisfaction.

Fill out the form to download the success story presentation!

    wpChatIcon